A pile‑screw foundation system was chosen for the project, which allowed for:
Site engineering preparation An analysis of the soil, hydrological, and site layout conditions was carried out.
Foundation system design An individual engineering solution was developed, taking into account the climatic and regulatory requirements of the region.
Pile manufacturing The production of ground screw foundations and metal structures was carried out in accordance with the project documentation.
Serial installation The foundations and structures were installed with control over verticality, geometry, and project levels.
Handover for solar power plant installation The prepared foundation system was handed over for the subsequent installation of photovoltaic modules.
an individually designed foundation and metal structures were required for the 366 kW solar power plant, with full quality control.
an individually designed foundation and metal structures were required for the 366 kW solar power plant, with full quality control.