A screw-pile foundation was used for the facility, which allowed for:
Engineering preparation of the site Assessment of site conditions and determination of ground screw installation points.
Foundation Engineering Development of the screw-pile foundation layout for the specific SPP configuration.
Manufacturing of Ground Screws Production of foundation elements in accordance with the project design.
Foundation Installation Installed 56 ground screws with control of geometry and height elevations.
Preparation for SPP Mounting The foundation has been handed over for the installation of metal structures and panels.
because a rapid solution was required—one that eliminated concrete, preserved the landscape, and ensured the precise installation of supports.