For the object, a screw pile foundation was applied, which allowed:
Design Development of a placement scheme for 20 ground screws, taking into account the solar power plant configuration.
Ground screw production Preparation of supports in accordance with design parameters and operating conditions.
Foundation installation Installation of ground screws with monitoring of depth, verticality, and elevation marks.
because a foundation was needed that ensures rapid installation of the solar power plant without concreting or pauses.