To implement the project, a screw pile foundation was utilized, which allowed for:
Engineering preparation of the site Site analysis was conducted and a foundation layout plan was developed, taking into account the ground-mounted solar power plant’s design and the extensive area of the facility.
Engineering of the foundation system A unified screw pile foundation design was developed with repeatable support geometry, adapted for serial installation without any concrete works.
Production of piles Production and preparation of 3,540 ground screws were ensured in accordance with the design parameters and the project implementation schedule.
Serial installation Installation was performed using a continuous flow method with monitoring of verticality, depth, and design elevations, ensuring a uniform and stable base for the entire solar power plant.
Handover for solar power plant mounting The foundation system was handed over for subsequent mounting of metal structures and photovoltaic panels without the need for any base adjustments.