Home / Portfolio / 4.68 MW SOLAR POWER PLANT IN KHERSON REGION

4.68 MW SOLAR POWER PLANT IN KHERSON REGION

Location
Pidstepne village, Kherson region
Date
November 2018
Ground screws
8,164 pcs
Panel positions
13,392
Object type
Ground-mounted solar power plant
Challenges
The implementation of foundation works took place under tight deadlines and a massive installation volume:
SELECTION CRITERIA
FOR THE ENGINEERING SOLUTION
The deciding factors were rapid installation without concreting, scalability, and precise support geometry.
Adopted Engineering Solution
For the project, a screw pile foundation using ground screws was selected, which allowed for:
The foundation was designed taking into account the loads from the solar panels, the station configuration, and the operating conditions.
РЕАЛІЗОВАНІ РІШЕННЯ
Інженери PILLAR
розробили проєкт палійно-
гвинтового фундаменту
Який ідеально підходить

Конструкція:

For the project, a screw pile foundation using ground screws was selected, which allowed for:

Тип паль:

Навантаження:

Особливості монтажу
Implementation Process
Engineering site preparation

Analysis of the site was conducted, and a foundation layout scheme was developed, taking into account the large area of the facility and the configuration of the ground-mounted solar power plant.

A unified screw pile foundation design was developed with repeatable support geometry, adapted for large-scale serial installation.

Manufacture and preparation of 8,164 ground screws were ensured in accordance with the project parameters and the approved implementation schedule.

Installation was carried out using a flow method with mechanized support placement and continuous monitoring of verticality, depth, and design marks across the entire area of the solar power plant.

The foundation system was handed over for subsequent mounting of metal structures and solar panels without the need for adjustments or additional preparatory work.

Result
The use of a screw pile foundation allowed for:
That is why the client turned to PILLAR

as they required a scalable solution for rapid solar power plant installation without the use of concrete.

That is why the client turned to PILLAR

as they required a scalable solution for rapid solar power plant installation without the use of concrete.

IMG_20181206_141656_IMG_2018-12-06_14204

Документація проекту

ВІДГУК КЛІЄНТА

PILLAR Implemented Solutions
Here are examples of completed projects that demonstrate our engineering approach and technical expertise.
Get a response
from our manager today!
All articles
Get a response
from our manager today!
Отримайте відповідь
від нашого менеджера сьогодні!