A screw pile foundation was applied for the facility, which allowed:
Engineering preparation Determination of the support layout and the driving points for the ground screws.
Foundation design Development of the screw pile foundation configuration for the solar power plant layout.
Production of ground screws Manufacturing of 14 ground screws according to the design parameters.
Foundation installation Rapid installation of ground screws with vertical alignment and elevation control.
as an engineering solution was required for the rapid installation of a small ses without concreting.
as an engineering solution was required for the rapid installation of a small ses without concreting.