A screw pile foundation was chosen for the facility, which made it possible to:
Site preparation An analysis of the geological and site conditions was conducted, and a layout for the foundations was determined in accordance with the configuration of the solar power plant.
ENGINEERING THE FOUNDATION SYSTEM Engineering calculations were performed, the specifications for the ground anchors were selected, and installation documentation was prepared.
PRODUCTION OF PILES We ensure the production of screw piles with strict control over their geometry and technical specifications.
SERIAL INSTALLATION Installation was performed using mechanized methods, with monitoring of verticality, screw-in depth, and positioning accuracy.
HANDOVER FOR SPP INSTALLATION The prepared foundation area has been handed over for the subsequent installation of the mounting system and photovoltaic modules.
Because a reliable, scalable foundation and mounting system were required for the 3.5 MW PV plant, enabling serial installation without concrete and full quality control.
Because a reliable, scalable foundation and mounting system were required for the 3.5 MW PV plant, enabling serial installation without concrete and full quality control.