A screw pile foundation was selected for the facility, which made it possible to:
Engineering site preparation Site analysis was conducted, and the foundation layout was refined in accordance with the ground-mounted SPP configuration for 2,640 photovoltaic panels.
Foundation system design The screw-pile foundation project was developed taking into account serial installation, loads from the SPP structures, and requirements for the precise geometry of the supports.
Production of piles The production of ground screws was ensured in accordance with the project parameters and the construction schedule of the solar power plant.
Serial installation The installation of the ground screws was completed with strict control over verticality and design elevations, without the use of concrete works or technological pauses.
Handover for SPP installation The foundation system was handed over for the subsequent installation of metal structures and photovoltaic modules within the overall SPP construction schedule.
as a precise and predictable foundation for the SPP was required without concrete and installation pauses
as a precise and predictable foundation for the SPP was required without concrete and installation pauses