A screw pile foundation was selected for the project, which allowed:
Site Engineering Preparation The geological and planning conditions were analyzed and the foundation layout was determined in accordance with the site configuration.
Foundation System Design Engineering calculations were carried out and the parameters of geo-groups were selected taking into account the dimensions of photovoltaic modules and SPP structures.
Production of piles The screw foundations were manufactured and completed in accordance with the approved project documentation.
Serial installation Foundations are mounted with control of verticality, depth of screwing and design marks.
Handover for SPP installation Foundation system and metal structures are transferred for further installation of photovoltaic modules.