A screw pile foundation was selected for the project, which allowed:
Engineering site assessment The assessment of soil conditions and moisture levels of the site has been conducted.
Project preparation The screw pile foundation project was developed with reference to the geometry of the modular house.
Production of piles A set of screw piles has been prepared according to the project parameters.
Delivery and installation The installation of 24 ground screws was completed in 2 working days with verticality and level control.
Completion and handover The finished foundation base has been handed over for the installation of the modular house.
as an engineering solution was required for the fast installation of a modular house on water-saturated soils.